KSP Steel is an integrated enterprise including a steel-smelting workshop, a pipe rolling mill and finishing lines. This integrated structure, which is supported by the quality management system, allows the company potential to be used to the maximum.
The KSP Steel plant’s design capacity is 270,000 tonne of steel seamless pipes per year, which can be increased to 350,000 tonne in the future. The plant can produce up to 50,000 tonne of tubing pipes, 150,000 tonne of casing pipes and 150,000 tonne of line pipes annually. A total of 2,200 tonne of pipes was produced in 2007. In 2008 the plant produced 7,000 tonne of pipes monthly. Now it is producing 15,000 tonne of pipes each month. The plan is to reach the monthly design capacity of up to 22,500 tonne in 2010. The plant is operating on a four shift continuous production basis.
The KSP Steel plant is furnished with equipment from such companies as Danieli, MAC, Cartacci, Tuboscope, Bronx, Colinet, PMC, Tiede, Sidermontaggi, which are recognized leaders in their fields.